Rule 13 of the Regional Coastal Plan requires a coastal permit to maintain, repair, replace, add to or alter any existing lawful structure, or any part of an existing lawful structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed not allowed by rules 6 to 12. Rule 10 of the Regional Coastal Plan permits the undertaking of any activity on any structure, or any part of a structure that is fixed in, on, under or over any foreshore or seabed, provided the activity complies with conditions stated in the rule. Rule 8 of the Regional Coastal Plan permits the erection or placement of any temporary structure, or any part of a temporary structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed, provided the activity complies with conditions stated in the rule. Rule 7 of the Regional Coastal Plan permits the removal or demolition of any structure, or any part of a structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed, provided the activity complies with conditions stated in the rule. "Existing" means existing on existing at 29 June 1994 (the date the Proposed Plan was publicly notified). Rule 6 of the Regional Coastal Plan permits the maintenance, repair, replacement, extension, addition or alteration of any existing lawful structure, or any part of an existing lawful structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed, provided the activity complies with conditions stated in the rule. Structures built or used in the coastal marine area See the Kapiti Coast District Plan, the Porirua City District Plan, the Wellington City District Plan, the Hutt City District Plan, the Upper Hutt District Plan, the South Wairarapa District Plan, the Carterton District Plan, or the Masterton District Plan. Structures outside the coastal marine area are controlled by rules in district plans. If the structure is above the line of mean high water springs, it is not in the coastal marine area. The erection, construction, placement, alteration, removal, or demolition of any structure anywhere in the coastal marine area is controlled in the Regional Coastal Plan. Wharves, jetties, breakwaters and seawalls are structures fixed in, on, under or over the foreshore or seabed. Vegetation disturbance (scrub clearance etc).Sewage discharges, including septic tanks. ![]() ![]() Quarries (gravel and shingle extraction).Jetties, wharves, breakwaters and seawalls.Incinerators, including school incinerators.Entry or passage across rivers and lakes.User Guide for existing regional rules and regulations.Regional plans, policies and strategies.Toitū Te Whenua Parks Network Plan 2020-2030.Greater Wellington's role and functions."January 1989.Jetties, wharves, breakwaters and seawalls | Greater Wellington Regional Council At head of title: Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Corps of Engineers Repair, Evaluation, Maintenance, and Rehabilitation Research Program (U.S.)Ĭover title. Army Engineer Waterways Experiment Station Coastal Engineering Research Center (U.S.) United States. Hidden Bibliographic Details Other authors / contributors:īottin, Robert R. ![]() Army Engineer Waterways Experiment Station) REMR-CO-3.īreakwaters - United States. Technical report REMR-CO-3 Technical report (U.S. Saved in: Bibliographic Details Author / Creator:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |